At the point when the control arrangement of the mixer is associated with a power source, the operation interface of the man–machine collaboration will show up and framework will start to process initialization, which incorporates the equation, concrete slump, concrete grade, and efficiency. Every storehouse and measuring container is checked by weighing framework. Its control framework will yield the signal of the measure of material to provoke the operator to choose whether to begin the control program or not. The belt conveyor is initiated to transmit the aggregates to the measuring container. The valve of the fly slag and concrete tank ought to be opened and the screw conveyor and engine are started to transmit them into the measuring container. The control valve of the water sump and admixture sump should be opened to influence water and admixture to stream into the measuring container. Once the weight of every material kind addresses the needs of particular amounts, the entryway of the measuring container is opened automatically. The materials will then be blended by a concrete mixer. Once the setting time is over, the loading door of the concrete mixer opens and the concrete streams into a concrete mixer truck. This procedure is directed very carefully because concrete must not segregate and furthermore, the concrete must be prepared and transported, and then utilized before its preparatory setting time, which is between 30 and 45 minutes. In a few nations, this is completed by a mobile concrete batching plant.